Changes between Version 135 and Version 136 of WikiStart


Ignore:
Timestamp:
Oct 3, 2016, 2:35:20 PM (8 years ago)
Author:
davarpan1s
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • WikiStart

    v135 v136  
    207207rotstr1_3009c: Input flow rate started from 20 L/s for the first 2 minutes and then was decreased to 5.5 L/s. The goal for this experiment was to add dye and visualize the behavior of the current at different locations. Gopros were placed at different locations to take movies of the current and to test which location is the best fit for taking movies.
    208208
    209 
    210 
    211 
    212 
     209'''Monday, October 3rd 2016'''
     210
     211The tank was drained, washed, cleaned, and refilled. New taller probes were built and installed for the stream wise UNP and the siphons. A new sequence for the transverse was considered and calibration for both conductivity probes was completed. All the data and the diary on the Wiki were updated and a new revised experimental plan was proposed for the next three weeks.
     212
     213'''Tuesday, October 4th 2016'''
     214
     215
     216