Changes between Version 136 and Version 137 of WikiStart
- Timestamp:
- Oct 3, 2016, 3:08:15 PM (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
WikiStart
v136 v137 121 121 = 7 - Diary: = 122 122 123 '''Monday September 19th 2016'''123 '''Monday, September 19th 2016''' 124 124 125 125 Experiment name: fixstr1_1909a … … 130 130 131 131 132 '''Tuesday September 20th 2016'''132 '''Tuesday, September 20th 2016''' 133 133 134 134 Paint was applied to the tank floor to address a leak in the flume, and the tank floor left to dry and seal. The siphon rig was completed and tested. The laser system was aligned. The position of the basal ADV was refined, Orgasol was required as additional seeding in order for bottom tracking to work effectively. Interesting, the stem (fixed) ADV picks this bottom point up better than the flexible ADV in the absence of seeding. Tested synchronization of ADV with traverse; a problem was identified with the nature of the required input signal. Investigation in progress as to how to address this. 135 135 136 '''Wednesday September 21st 2016'''137 138 139 '''Thursday September 22nd 2016'''136 '''Wednesday, September 21st 2016''' 137 138 139 '''Thursday, September 22nd 2016''' 140 140 141 141