264 | | The tank was filled with water. Calibration curves for both probes were prepared (C,,1,, is the conductivity probe in the inlet box and C,,0,, is the one on the traverse). The traverse was reprogrammed for the new sequence. However, they have programmed it in a way that the total timing is about 15 minutes, instead of the proposed 19.5 minutes. They have decreased the stationary time and the move time, but the ADV dwell time stayed the same (60 s). Two experiments were conducted for Rossby number infinity. |
265 | | |
266 | | Experiment name: fixstr1_0410a and fixapex2_0410b. File names: fixstr1_0410a, fixapex2_0410b. Density excess and temperature for both experiments was 18.8 kg/m^3^ and 22.4°C respectively. Input flow rate started with 13.1 L/s and was decreased to 5.8 L/s. The start of the experiments (t=0 on the stopwatch) was when the flow rate and conductivity of the inlet box became constant. |
267 | | |
268 | | fixstr1_0410a: The total experiment time was 36 minutes. PIV measurements were conducted for the first 10 minutes of the experiment. ADV data was collected at the straight section (Position X1 - 75% down straight section, 58 cm upstream from the end of the straight section) from 15 to 25 min after the flow rate became constant. 7 sets of siphon samples were collected at 5, 10, 15, 20, 25, 30 and 35 minutes after the start of experiment each with a duration of 1 minute. Cross-stream UVP collected data from 5 to 15 minutes and down-stream UVP collected data from 25 to 35 minutes. |
| 264 | Test experiments have been completed, and the instrumentation and experimental sequence and conditions optimised. Today, the main data gathering for the experimental programme started. The tank was filled with water. Calibration curves for both probes were prepared (C,,1,, is the conductivity probe in the inlet box and C,,0,, is the one on the traverse). The traverse was reprogrammed for the new sequence. This has been programmed such that the total timing is about 15 minutes, instead of the proposed 19.5 minutes. This was achieved by decreasing the stationary time and the move time, but the ADV dwell time stayed the same (60 s). Two experiments were conducted for Rossby number infinity. |
| 265 | |
| 266 | Experiment name: fixstr1_0410a and fixapex2_0410b. File names: fixstr1_0410a, fixapex2_0410b. Density excess and temperature for both experiments were 18.8 kg/m^3^ and 22.4°C respectively. Input flow rate started with 13.1 L/s and was decreased to 5.8 L/s. The start of the experiments (t=0 on the stopwatch) was when the flow rate and conductivity of the inlet box became constant. |
| 267 | |
| 268 | fixstr1_0410a: The total experiment time was 36 minutes. PIV measurements were conducted for the first 10 minutes of the experiment. ADV data was collected at the straight section (Position X1 - 75% down straight section, 58 cm upstream from the end of the straight section) from 15 to 25 min after the flow rate became constant. 7 sets of siphon samples were collected at 5, 10, 15, 20, 25, 30 and 35 minutes after the start of the experiment each with a duration of 1 minute. The cross-stream UVP collected data from 5 to 15 minutes, and the down-stream UVP collected data from 25 to 35 minutes. |
276 | | Experiment name: rotstr1_0510a and rotapex2_0510b. File names: rotstr1_0510a, rotapex2_0510b. Inflow rate for both experiment started with 13.1 L/s and then was decreased to 5.84 L/s until it reached a constant level. |
277 | | |
278 | | rotstr1_0510a: The total experiment time was 36 mins. PIV measurements were conducted for the first 10 minutes of the experiment. However, the water was not as clear as expected and there were a lot of bubbles on the tank’s wall, so the quality of the PIV data may be low. Density excess and temperature were 20 kg/m^3^ and 22.6°C, respectively. ADV data was collected at the straight section (Position X1 - 75% down straight section, 58 cm upstream from the end of the straight section) from 15 to 25 min after the flow rate became constant. 7 sets of siphon samples were collected at 5, 10, 15, 20, 25, 30, and 35 minutes after the start of the experiment, with a duration of 1 minute. Cross stream UVP collected data from 5 to 15 minutes and down-stream UVP collected data from 25 to 35 minutes. |
| 276 | Experiment name: rotstr1_0510a and rotapex2_0510b. File names: rotstr1_0510a, rotapex2_0510b. Inflow rate for both runs started with 13.1 L/s and then was decreased to 5.84 L/s until it reached a constant level. |
| 277 | |
| 278 | rotstr1_0510a: The total experiment time was 36 mins. PIV measurements were conducted for the first 10 minutes of the experiment. However, the water was not as clear as expected and there were a lot of bubbles on the tank’s wall, so the quality of the PIV data may be low. Density excess and temperature were 20 kg/m^3^ and 22.6°C, respectively. ADV data were collected at the straight section (Position X1 - 75% down straight section, 58 cm upstream from the end of the straight section) from 15 to 25 min after the flow rate became constant. 7 sets of siphon samples were collected at 5, 10, 15, 20, 25, 30, and 35 minutes after the start of the experiment, with a duration of 1 minute. The cross stream UVP collected data from 5 to 15 minutes, and the down-stream UVP collected data from 25 to 35 minutes. |
288 | | rotstr1_0610a: The total experiment time was 36 mins. Inflow rate started with 10.97 L/s and then was decreased to 5.75 L/s until it reached a constant level. The water was dirty so no PIV measurements were conducted. Density excess and temperature were 20 kg/m^3^ and 22.7°C, respectively. ADV data was collected at the straight section (Position X1 - 75% down straight section, 58 cm upstream from the end of the straight section) from 15 to 25 min after the flow rate became constant. 7 sets of siphon samples were collected at 5, 10, 15, 20, 25, 30, and 35 minutes after the start of the experiment, with a duration of 1 minute. Cross stream UVP collected data from 5 to 15 minutes and down-stream UVP collected data from 25 to 35 minutes. |
| 288 | rotstr1_0610a: The total experiment time was 36 mins. Inflow rate started with 10.97 L/s and then was decreased to 5.75 L/s until it reached a constant level. The water was dirty so no PIV measurements were conducted. Density excess and temperature were 20 kg/m^3^ and 22.7°C, respectively. ADV data were collected at the straight section (Position X1 - 75% down straight section, 58 cm upstream from the end of the straight section) from 15 to 25 min after the flow rate became constant. 7 sets of siphon samples were collected at 5, 10, 15, 20, 25, 30, and 35 minutes after the start of the experiment, with a duration of 1 minute. The cross stream UVP collected data from 5 to 15 minutes, and the down-stream UVP collected data from 25 to 35 minutes. |
302 | | rotstr1_1010a: The total experiment time was 36 mins. Inflow rate started with 10.86 L/s and then was decreased to 5.92 L/s until it reached a constant level. The water was dirty so no PIV measurements were conducted. Density excess and temperature were 19.7 kg/m^3^ and 23.3°C, respectively. ADV data was collected at the straight section (Position X1 - 75% down straight section, 58 cm upstream from the end of the straight section) from 15 to 25 min after the flow rate became constant. 7 sets of siphon samples were collected at 5, 10, 15, 20, 25, 30, and 35 minutes after the start of the experiment, with duration of 1 minute. Cross stream UVP collected data from 5 to 15 minutes and down-stream UVP collected data from 25 to 35 minutes. |
| 302 | rotstr1_1010a: The total experiment time was 36 mins. Inflow rate started with 10.86 L/s and then was decreased to 5.92 L/s until it reached a constant level. The water was dirty so no PIV measurements were conducted. Density excess and temperature were 19.7 kg/m^3^ and 23.3°C, respectively. ADV data were collected at the straight section (Position X1 - 75% down straight section, 58 cm upstream from the end of the straight section) from 15 to 25 min after the flow rate became constant. 7 sets of siphon samples were collected at 5, 10, 15, 20, 25, 30, and 35 minutes after the start of the experiment, with duration of 1 minute. The cross stream UVP collected data from 5 to 15 minutes, and the down-stream UVP collected data from 25 to 35 minutes. |
308 | | rotstr1_1010c: The total experiment time was 36 mins. Inflow rate started with 10.86 L/s and then was decreased to 5.75 L/s until it reached a constant level. The water was dirty so no PIV measurements were conducted. Density excess and temperature were 20.2 kg/m^3^ and 24.3°C, respectively. ADV data was collected at the straight section (Position X1 - 75% down straight section, 58 cm upstream from the end of the straight section) from 15 to 25 min after the flow rate became constant. 7 sets of siphon samples were collected at 5, 10, 15, 20, 25, 30, and 35 minutes after the start of the experiment, with duration of 1 minute. Cross stream UVP collected data from 5 to 15 minutes and down-stream UVP collected data from 25 to 35 minutes. |
| 308 | rotstr1_1010c: The total experiment time was 36 mins. Inflow rate started with 10.86 L/s and then was decreased to 5.75 L/s until it reached a constant level. The water was dirty so no PIV measurements were conducted. Density excess and temperature were 20.2 kg/m^3^ and 24.3°C, respectively. ADV data were collected at the straight section (Position X1 - 75% down straight section, 58 cm upstream from the end of the straight section) from 15 to 25 min after the flow rate became constant. 7 sets of siphon samples were collected at 5, 10, 15, 20, 25, 30, and 35 minutes after the start of the experiment, with duration of 1 minute. The cross stream UVP collected data from 5 to 15 minutes, and the down-stream UVP collected data from 25 to 35 minutes. |